Challenge / Goal
The aim of the use case is to provide a nearly CO2 neutral heat supply in Strijp-S, through replacing heat provision utility (gas) with one powered by renewable energy (biomass).
Solution
Standard & Technical Details: 2.5km of piping, 8.2 MW heat and 1.6 MW of electricity biomass plant.
The solution is changing steam pipes to district heating based on water as energy transmitter. The power is supplied via a biomass power plant owned by the municipality. Pipes can be used with any other water based heat production system. The biomass power plant is fueled by the waste of public green spaces.
Images
Want to learn more about the lessons learned, financial details and results?
Log inTime period
Planning time
Less than 6 months
Implementation time
Less than 6 months
Reducing use of fossils
Reducing GHG emissions
Increasing share of renewables